Ask what the quote includes

A supplier may need to evaluate construction, identify details that deform at the target size and define how prototype revisions are handled.

Ask what controls bulk production

After sample approval, production materials, key techniques and appearance standards should be clear for the specific project. Unit price alone does not reveal these differences.

Three useful comparison questions

  • Which prototype revisions are included?
  • What reference will control bulk production?
  • How will the finished production be inspected?

Turn the decision into verifiable inputs

Align artwork version, finished size, estimated quantity, intended use and sales market before discussing fabric, decoration, attachments and packing. Without those inputs, price, time and fidelity do not describe one executable project.

For 10–20 cm work, pattern volume, facial spacing, pile and stuffed curvature interact. Leqiqu keeps 18+ fabric types in regular stock, while the physical swatch, approved sample and destination requirements govern the final choice.

Baseline conditions for a custom plush decision
ConditionConfirmRisk if missing
Artwork and sizeViews, 10–20 cm target and recognition featuresPattern and facial positions rely on assumptions
Material and methodSwatch, pile, embroidery/print/appliqué and componentsColour, silhouette and legibility cannot be compared
Quantity and timingEstimate, approval points, 5–7 day sampling and 15–20 day production referencesQuote and delivery have no shared basis
Market and testingDestination, age, material and constructionApplicable EN 71, ASTM F963, GB 6675, ST or KC scope is unknown
Production referenceSample, photos, dimensions, materials and packing versionBulk inspection becomes subjective

Reduce information loss from sample to production

Sampling converts flat assumptions into a physical object. Review silhouette, proportion and expression first, then material, colour, stitching, components and packing. Revision notes should identify location, symptom and target.

After approval, align production fabric, key dimensions, methods and inspection points. Leqiqu can arrange applicable market-specific testing and third-party laboratory submission after requirements are confirmed; this is not a universal certification claim.

Client artwork, quotations and order information remain confidential. Public guidance uses general production reasoning and confirmed public Leqiqu parameters rather than unauthorized cases.

  • Regular sampling reference: 5–7 working days
  • Bulk-production reference: 15–20 days after approval
  • No uniform MOQ; evaluate size, process, material and quantity
  • 80+ in-house people and 300+ people in collaborative external lines
  • Applicable testing can be arranged by target market

Additional project control

This page also uses a project-control layer: confirm the actual artwork, finished size, physical fabric, technique files, approved sample and target-market scope before production. The Chinese edition contains the detailed factory-side mechanism notes; the English edition is written around the same buyer decisions rather than presented as a literal translation.